LGH Case Studies
Every LGH case study showcases real-world problem-solving, precision, and performance. From sliding a 536-ton steel bridge into place to lifting turbine generators and positioning priceless museum artifacts, our team thrives on complex challenges. These stories highlight the creativity, equipment, and expertise behind some of North America’s most demanding lifting and rigging projects.
Explore each LGH case study to see how we help customers overcome constraints like low headroom, tight timelines, heavy loads, and unique site conditions—with safe, certified, and custom-engineered solutions.
Case Study: Vertically Lifting a Hydroelectric Turbine Rotor
First Time for Everything: Vertically Lifting a Hydroelectric Turbine Rotor The Situation Our friends at TCB Industrial out of Modesto, CA, recently undertook a powerhouse plant maintenance project to overhaul a hydroelectric turbine generator. As part of this project, they needed to lift and articulate the turbine’s rotor into a vertical position. “We were essentially doing […]
Read More
Case Study: Emergency Hiperbaric Chamber Installation Within 1 Millimeter of Accuracy on the XYZ Plane
Case Study: LGH Assists Emergency Hiperbaric Chamber Installation Within 1 Millimeter of Accuracy on the XYZ Plane The Situation Recently, LGH customer Pennsylvania Crane, Hoist & Rigging Company out of King of Prussia, PA, received an emergency call from a food-grade facility that needed to replace a 56,000-pound Hiperbaric High-Pressure Processing (HPP) chamber. When the […]
Read More
Case Study: How Moving 170,000 lbs Went Off Without a Hitch
How Moving 170,000 lbs Went Off Without a Hitch We love it when a plan comes together! LGH recently worked with BW Contractors, Inc in Cedar Falls, Iowa, to produce a rigging solution for moving and installing two aluminum extrusion pieces. BW Contractors, who specialize in machinery moving and erection, were called upon to […]
Read More
Case Study: Mechanical Adjustments Crucial in CMOD Install of Air Handlers at Salk Hall
Talk About a Tight Fit: Mechanical Adjustments Crucial in CMOD Install of Air Handlers at Salk Hall LGH recently worked with Ruthrauff Sauer in Pittsburgh, assisting on an air handler installation at the University of Pittsburgh, the home of the School of Pharmacy and the School of Dental Medicine. Bob Snyder was the foreman […]
Read More
Case Study: Data Center Chiller Install With Double CMOD Setup
Data Center Chiller Install With Double CMOD Setup LGH Equipment Used: • 20-foot MOD50 Spreader Beam • CMOD Spreader Frame (9×9 and 9×12 configurations) • Four 3T Come-A-Longs Introduction LGH was called upon to provide equipment for a long-time customer, AMS Mechanical, performing an install of five air-cooled chiller units into a new data […]
Read More
Case Study: Creative Use of Bull Rigging to Replace an Attemperator
Creative Use of Bull Rigging to Replace an Attemperator Ontario-based contractor WSN Construction was called upon to perform a replacement of an attemperator from one of their boilers, replacing an outdated unit with a newer one composed of grade P91 advanced chromium molybdenum steel. Working within the constraints of the 875MW power plant in Brampton, […]
Read More
Case Study: Powerhouse Duct Conversion with LGH Rigging
Case Study: Powerhouse Duct Conversion with LGH Rigging and Lifting Hayes Mechanical installed new ductwork to reverse the flow of gases going through an existing electrostatic precipitator, utilizing air chain hoists, trolleys, MODULIFT® modular spreader beams, and rigging supplied by Lifting Gear Hire. THE SITUATION In 2014, Hayes Mechanical was contracted by a Midwest power […]
Read More
Case Study: Lifting a Steam Boiler onto Greektown Casino in Downtown Detroit
Case Study: Lifting a Steam Boiler onto Greektown Casino in Downtown Detroit When Greektown Casino needed a steam boiler lifted onto its rooftop, Dee Cramer was tasked with executing a high-profile, high-risk lift in the heart of downtown Detroit. Using rented modular spreader bars, shackles, and nylon slings from LGH, the team safely installed the […]
Read More
Case Study: Bayonne Bridge Approaches Project
Case Study: LGH Supports Bayonne Bridge Demolition with Certified Modular Rigging Solutions GCCOM Construction Company Inc. partnered with LGH to safely dismantle the Bayonne Bridge Approaches while working beneath an active bridge construction site. With limited headroom, multiple trades on-site, and strict safety requirements, GCCOM relied on certified modular rigging and lifting equipment from […]
Read More
Case Study: Chicago’s Congress Parkway Bridge Gets a Makeover
Case Study: Chicago’s Congress Parkway Bascule Bridge Gets a Modern Upgrade Rehabilitating a 60-year-old bascule bridge in the heart of downtown Chicago is no small task—especially when the structure has never undergone a full overhaul. That was the challenge facing Walsh Construction during the rehabilitation of the Congress Parkway Bascule Bridge. With daily vehicle traffic, […]
Read More